Overlake central Infiltration Vault

Park Bench

Project Overview

The Overlake Infiltration Vault is the third of three regional stormwater facilities proposed for Overlake Village. This large facility will complete the retrofit of the Overlake basin to current stormwater runoff treatment and flow control standards.

This vault will be constructed as redevelopment occurs in the future, probably in the late 2020s. A two-acre park, Overlake Central Park , will be constructed on top of the stormwater vault, surrounded by new Overlake Village Street Grid.