Topics that will be discussed at future Planning Commission meetings are shown below with a tentative date for discussion.  All topics and dates are tentative (subject to change). To confirm meeting agenda items, and to review materials for current and prior meetings, refer to the Agendas & Materials page.  

January 2022

  • 12th-HB-1220 Implementation: report approval; 2022 Annual Docket: introduction and initial study sessions; Tree Regulations: study session
  • 26th-Redmond 2050: monthly briefing; 2022 Annual Docket: study session; Tree Regulations: report approval

February 2022

  • 9th-2022 Annual Docket: public hearings; Redmond 2050: Housing, Economic Vitality, and Transportation Elements draft 1.0 study session
  • 23rd-2022 Annual Docket: study sessions; Redmond 2050: monthly briefing, Housing, Economic Vitality, and Transportation Elements draft 1.0 study session; growth alternatives

March 2022

  • 9th-2022 Annual Docket: report approval; Redmond 2050: Housing, Economic Vitality, and Transportation Elements draft 1.0 study session; Urban Centers draft 1.0 study session; growth alternatives
  • 23rd-Redmond 2050: monthly briefing; Housing, Economic Vitality, and Transportation Elements draft 1.0 study session; growth alternatives
  • 30th-potential special meeting

April 2022

  • 13th-Redmond 2050: Urban Centers draft 1.0 study session, Draft Environmental Impact Statement
  • 27th-Redmond 2050: Draft Environmental Impact Statement

2022 Work Program

The 2022 work program for the Planning Commission will consist of the following topics. They'll appear on the extended agenda to the left as they  reach the point where we can tentatively schedule them for meetings.  


DOCUMENTS BY TOPIC 

Documents are grouped into sections:  Plan & Policy Updates, Redmond 2050, Annual Docket, and Code Updates.  They are sorted alphabetically then by date within each section.  Documents shown are Planning Commission packet materials, with the date of the PC meeting shown.  Additional documents and project pages may be available.  

PLAN & POLICY UPDATES

Comprehensive Plan Fee Update

  1. 2021_01-13 - Memo - Comp Plan Fee & Docket Item Update
  2. 2021_01-13 - Presentation - Comp Plan Fee & Docket Item Update
  3. 2021_03-31 - Memo - Docket Schedule (PDF)
  4. 2021_03-31 - Memo - Sewer Plan update (PDF)
  5. 2021_03-31 - Memo Attachment A - Executive Summary (PDF)
  6. 2021_03-31 - Memo Attachment B - Comp Plan policies (PDF)
  7. 2021_03-31 - Presentation - Sewer Plan Update (PDF)
  8. 2021_04-14 - Memo - 20-21 Docket - Package 1
  9. 2021_04-14 - Presentation - Annual Docket - revised
  10. 2021_04-14 Attachment A - Retail Marijuana Expansion Alternative 1 (PDF)
  11. 2021_04-14 Attachment B - Retail Marijuana Expansion Alternative 2 (PDF)
  12. 2021_04-14 Attachment C - Economic Vitality Amendment - Affordable Commercial Space (PDF)
  13. 2021_04-14 Attachment D - Housing Element Amendment - Affordable Housing (PDF)
  14. 2021_04-14 Planning Commission Presentation Annual Docket (PDF)
  15. 2021_04-21 Memo - Sewer Plan update (PDF)
  16. 2021_04-21 - Memo Attachment C - Comp Plan policies (PDF)
  17. 2021_04-21 _Presentation_ General WW Plan Update (PDF)
  18. 2021_04-28 - 2021 Annual Docket - Presentation (Revised)
  19. 2021_04-28 - 2021 Docket - Memo - Package 2 (PDF)
  20. 2021_04-28 - 2021 Docket - Memo Attachment A - Neighborhoods and Land Use Element Update (PDF)
  21. 2021_04-28 - 2021 Docket - Presentation (PDF)
  22. 2021_04-28 - 2022 Docket - Memo - Initial Briefing to PC (PDF)
  23. 2021_04-28 - 2022 Docket - Memo Attachment A - RTC Materials (PDF)
  24. 2021_04-28 - 2022 Docket - Memo Attachment B - CIM Group Materials (PDF)
  25. 2021_04-28 - 2022 Docket - Memo Attachment C - Evans Creek Relocation Materials (PDF)
  26. 2021_04-28 - 2022 Docket - Presentation (PDF)
  27. 2021_05_26 - Memo - Sewer Plan update (PDF)
  28. 2021_05_26 - Memo Attachment A - Tech Committee Report (PDF)
  29. 2021_05_26 - Memo Attachment B - Sewer Plan update Q and A (PDF)
  30. 2021_05-12 - Memo - 20-21 Docket - Retail Marijuana Sales (PDF)
  31. 2021_05-12 - Memo Attachment A - FAQ and Location Considerations (PDF)
  32. 2021_05-12 - Presentation - Retail MJ Expansion - rev
  33. 2021_05-12 - Presentation - Retail MJ Expansion (PDF)
  34. 2021_05-26 - Memo - 2021 Docket - Education Hill and LU Designation Amendment (PDF)
  35. 2021_05-26 - Memo - 2022 Docket Applications (PDF)
  36. 2021_05-26 - Memo - Public Safety Functional Plan Update (PDF)
  37. 2021_05-26 - Memo Attachment A - Ordinance 2579 Map (PDF)
  38. 2021_05-26 - Memo Attachment B - Ordinance 2930 Map (PDF)
  39. 2021_05-26 - Presentation - 2022 Docket (PDF)
  40. 2021_05-26 - Presentation - Education Hill Land Use Designation Change (PDF)
  41. 2021_06_09 - 2021 Docket - Memo - Sewer Plan update (PDF)
  42. 2021_06_09 - 2021 Docket - Memo Attachment A - Draft PC Report (PDF)
  43. 2021_06_09_21 - 2021 Docket - Retail Marijuana Presentation (PDF)
  44. 2021_06_09_21 - 2021 Docket - Retail Marijuana Public Hearing Memo (PDF)
  45. 2021_06_09_21 - 2021 Docket - Retail Marijuana Tech Committee Report (PDF)
  46. 2021_06_09_21 - 2021 Docket - Retail Marijuana Tech Report Exhibit A - Staff Analysis (PDF)
  47. 2021_06_09_21 - 2021 Docket - Retail Marijuana Tech Report Exhibit B - Comp Plan Amendments (PDF)
  48. 2021_06_09_21 - 2021 Docket - Retail Marijuana Tech Report Exhibit C - Zoning Code Amendments (PDF)
  49. 2021_06_09_21 - 2021 Docket - Retail Marijuana Tech Report Exhibit D - SEPA Determination (PDF)
  50. 2021_06_16 - 2021 Docket - Memo Attachment B - Tech Report Exhibit A - Staff Analysis (PDF)
  51. 2021_06_16 - 2021 Docket - Memo Attachment C - Tech Report Exhibit B - Comp Plan Amendments (PDF)
  52. 2021_06_16 - 2021 Docket - Memo Attachment D - Tech Report Exhibit C - SEPA 202100349 (PDF)
  53. 2021_06_16_21 - 2021 Docket - Memo - Retail Marijuana Public Hearing Memo (PDF)
  54. 2021_06_16_21 - 2021 Docket - Memo Attachment A - 06-16-21 Issues Matrix (PDF)
  55. 2021_06_16_21 - 2021 Docket - Memo Attachment B - 03-23 16 Issues Matrix for 2016 Amendments(PDF)
  56. 2021_06-16 - 2021 Docket - Memo - Education Hill and LU Designation Amendment (PDF)
  57. 2021_06-16 - 2021 Docket - Memo Attachment A - Technical Committee Report (PDF)
  58. 2021_06-16 - 2021 Docket - Presentation - Education Hill - revised
  59. 2021_06-16 - 2021 Docket - Presentation - Education Hill (PDF)
  60. 2021_06-16 - Applicant Presentation - 2022 Docket - CIM
  61. 2021_06-16 - Applicant Presentation - 2022 Docket - RTC
  62. 2021_06-16 - Applicant Testimony - 2022 Docket - Evans Creek
  63. 2021_06-16 - Applicant Testimony - 2022 Docket - Public Safety
  64. 2021_06-16 - Memo - 2022 Docket Public Hearing (PDF)
  65. 2021_06-16 - Presentation - 2022 Docket - revised
  66. 2021_06-16 - Presentation - 2022 Docket (PDF)
  67. 2021_06-30 - 2021 Docket - Affordable Commercial PC Report (PDF)
  68. 2021_06-30 - 2021 Docket - Affordable Commercial PC Report Attachment A - Tech Committee Report (PDF)
  69. 2021_06-30 - 2021 Docket - Affordable Commercial PC Report Attachment B - PH Notice (PDF)
  70. 2021_06-30 - 2021 Docket - Affordable Housing PC Report (PDF)
  71. 2021_06-30 - 2021 Docket - Affordable Housing PC Report Attachment B - PH Notice (PDF)
  72. 2021_06-30 - 2021 Docket - Memo - Affordable Housing and Affodable Commercial - revised
  73. 2021_06-30 - 2021 Docket - Memo - Affordable Housing and Affodable Commercial (PDF)
  74. 2021_06-30 - 2021 Docket - Presentation - Affordable Housing and Affordable Commercial (PDF)
  75. 2021_06-30 - 2022 Docket - PC Report (PDF)
  76. 2021_06-30 - 2022 Docket - PC Report (PDF)
  77. 2021_06-30 - 2022 Docket - PC Report Attachment A - Applications (PDF)
  78. 2021_06-30 - 2022 Docket - PC Report Attachment A - Applications (PDF)
  79. 2021_06-30 - 2022 Docket - PC Report Attachment B - Staff Analysis (PDF)
  80. 2021_06-30 - 2022 Docket - PC Report Attachment B - Staff Analysis (PDF)
  81. 2021_06-30 - 2022 Docket - PC Report Attachment C - Applicant Testimony Materials (PDF)
  82. 2021_06-30 - 2022 Docket - PC Report Attachment C - Applicant Testimony Materials(PDF)
  83. 2021_06-30 - 2022 Docket - PC Report Attachment D - Public Hearing Notice (PDF)
  84. 2021_06-30 - 2022 Docket - PC Report Attachment D - Public Hearing Notice (PDF)
  85. 2021_06-30 - PC Report - Retail Marijuana Sales (PDF)
  86. 2021_06-30 - PC Report Attachment A - Issues Matrix (PDF)
  87. 2021_06-30 - PC Report Attachment B - Public Comment Matrix (PDF)
  88. 2021_06-30 - PC Report Attachment C - Tech Report w attachments (PDF)
  89. 2021_06-30 - PC Report Attachment D - Public Notice (PDF)
  90. 2021_06-30- 2021 Docket - Presentation - Education Hill
  91. 2021_06-30 -2021 Docket Affordable Housing PC Report Attachment A - Tech Committee Report (PDF)
  92. 2021_07-07 - 2021 Docket - Ed Hill - PC Report (PDF)
  93. 2021_07-07 - 2021 Docket - Ed Hill - PC Report Attachment A - Issues Matrix (PDF)
  94. 2021_07-07 - 2021 Docket - Ed Hill - PC Report Attachment B - Public Comment and Applicant Testimony (PDF)
  95. 2021_07-07 - 2021 Docket - Ed Hill - PC Report Attachment B - Public Comment and Applicant Testimony_Redacted (PDF)
  96. 2021_07-07 - 2021 Docket - Ed Hill - PC Report Attachment C - Technical Committee Report (PDF)
  97. 2021_07-07 - 2021 Docket - Ed Hill - PC Report Attachment D - Staff Analysis (PDF)
  98. 2021_07-07 - 2021 Docket - Ed Hill - PC Report Attachment E - Public Notice (PDF)
  99. 6_30-16 - 2021 Docket - Memo - Education Hill and LU Designation Amendment (PDF)
  100. PlanningCommissionDocketSchedule

REDMOND 2050

Redmond 2050 - General

  1. 2020_09-23 - Presentation (PDF)
  2. 2020_05-27 - Memo Attachment - April 14th Council Memo - Scope Overview
  3. 2020_05-27 - Memo Attachment - King County CPP Update 04-23-20
  4. 2020_05-27 - Memo Attachment - March 10th Council Memo - Regional Context
  5. 2020_05-27 - Memo Attachment - May 19th Council Memo - Scope and Engagement
  6. 2020_05-27 - Memo Attachment A - Scope and Timeline
  7. 2020_05-27 - Memo Attachment B - Community Benefits
  8. 2020_05-27 - Memo Attachment C - DRAFT Community Engagement Plan
  9. 2020_05-27 - Staff Memo - Redmond 2050
  10. 2020_05-27-20 - Presentation - Regional Planning Framework (PDF)
  11. 2020_05-27-20 - Presentation - Scope and Engagement (PDF)
  12. 2020_08-12 - Memo Attachment A - CAC Application
  13. 2020_08-12 - Memo Attachment B - Visioning scope
  14. 2020_08-12 - Memo Attachment C - SEPA scope
  15. 2020_08-12 - Memo Attachment D - Timeline
  16. 2020_08-12 - Staff Memo - Monthly Briefing
  17. 2020_08-26 - Memo Attachment A - Scope and Timeline (PDF)
  18. 2020_08-26 - Memo Attachment B - Community Engagement Plan (PDF)
  19. 2020_08-26 - Presentation - Redmond 2050 Resolution (PDF)
  20. 2020_08-26 - Staff Memo - Redmond 2050 Resolution (PDF)
  21. 2020_09-23 - Staff Memo - Monthly Briefing (PDF)
  22. 2020_10-21 - Staff Memo - Monthly Briefing (PDF)
  23. 2020_11-04 - Presentation - Monthly Briefing (PDF)
  24. 2020_11-04 - SEPA - Scoping Document (PDF)
  25. 2020_11-04 - SEPA - Scoping Notice (PDF)
  26. 2020_11-04 - Staff Memo - Monthly Briefing (PDF)
  27. 2020_12-09 - Presentation - Monthly Briefing (PDF)
  28. 2020_12-09 - Staff Memo - Monthly Briefing (PDF)
  29. 2020-02-17 - Memo Attachment A - Stakeholder Interviews Summary (PDF)
  30. 2020-02-17 - Memo Attachment B - SEPA Scoping Summary (PDF)
  31. 2020-02-17 - Memo Attachment C - SEPA Scoping Questionnaire Responses (PDF)
  32. 2020-02-17 - Memo with Attachments (PDF)
  33. 2021_01-27 - Memo - Redmond 2050 Briefing (PDF)
  34. 2021_02-17 - Memo - Redmond 2050 monthly briefing (PDF)
  35. 2021_02-17 - Memo - Redmond 2050 Themes (PDF)
  36. 2021_02-17 - Presentation - Redmond 2050 monthly briefing (PDF)
  37. 2021_02-17 - Presentation - Redmond 2050 Themes (PDF)
  38. 2021_03-24 - Memo - Redmond 2050 - Climate Change Assessment (PDF)
  39. 2021_03-24 - Presentation - Redmond 2050 briefing (PDF)
  40. 2021_03-31 - Memo - Redmond 2050 - Overlake (PDF)
  41. 2021_03-31 - Presentation - Overlake (PDF)
  42. 2021_04_14-Memo - Required Updates - Housing, Economic Vitality (PDF)
  43. 2021_04_14-Slides - Required Updates - Housing, Economic Vitality (PDF)
  44. 2021_04_21 - Memo - Redmond 2050 Monthly Update (PDF)
  45. 2021_04_21 - Memo Attachment A - Stakeholder Interviews Summary (PDF)
  46. 2021_04_21 - Memo Attachment B - Business Roundtable Discussion (PDF)
  47. 2021_04_21 - Memo Attachment C - Themes Comments (PDF)
  48. 2021_04_21 - Memo Attachment D - Visioning Round 3 (PDF)
  49. 2021_04_21 - Presentation - Redmond 2050 briefing (PDF)
  50. 2021_05_12 - Growth Scenarios Presentation (PDF)
  51. 2021_05_12 - Memo - Redmond 2050 - Growth Scenarios (PDF)
  52. 2021_05_12 - Presentation - Growth Scenarios - Revised
  53. 2021_05_26 - Memo - Redmond 2050 Monthly Update (PDF)
  54. 2021_06_09 - Memo - Policy Options and Alternatives (PDF)
  55. 2021_06_09 - Memo Attachment A - Housing Options and Alternatives (PDF)
  56. 2021_06_09 - Memo Attachment B - Housing Change Matrix (PDf)
  57. 2021_06_09 - Memo Attachment C - Economic Vitality Options and Alternatives (PDF)
  58. 2021_06_09 - Memo Attachment D - Economic Vitality Change Matrix (PDF)
  59. 2021_06_09 - Presentation - Options and Alternatives - Revised
  60. 2021_06_09 - Presentation - Options and Alternatives (PDF)
  61. 2021_07_14 - Memo - Redmond 2050 Themes (PDF)
  62. 2021_07_14 - Memo - Required Updates - Overlake and Urban Centers (PDF)
  63. 2021_07_14 - Memo - Urban Centers Element briefing (PDF)
  64. 2021_07_14 - Memo Attachment A - Draft PSRC Centers Checklist (PDF)
  65. 2021_07_14 - Memo Attachment A - Themes 2.0 Report (PDF)
  66. 2021_07_14 - Memo Attachment B - Themes Flyers (PDF)
  67. 2021_07_14 - Presentation - Redmond 2050 Themes (PDF)
  68. 2021_07-07 - Memo - Redmond 2050 - TOD briefing (PDF)
  69. 2021_07-07 - Memo Attachment A - Growing Transit Communities summary (PDF)
  70. 2021_07-07 - Memo Attachment B - Overlake Center Boundary Revision (PDF)
  71. 2021_07-07 - Presentation - TOD - revised
  72. 2021_07-07 - Presentation - TOD.potx (PDF)
  73. 2021_07-14 - Memo Attachment A - Element Update Process Overview (PDF)
  74. 2021_07-14 - Presentation - Urban Centers and Overlake (PDF)
  75. 2021_07-28 - Presentation - Monthly update - universal design
  76. 2021_07-28 - Presentation - Urban Centers Element
  77. 2021_08_25 - Memo - PARCCs Required Updates
  78. 2021_08-25 - Presentation - PARCC Element
  79. 2021_08-25 - Redmond 2050 Monthly Update
  80. 2021_09_08 - Att A - MODRN Scan (PDF)
  81. 2021_09_08 - Att B - Housing Change Matrix - Other (PDF)
  82. 2021_09_08 - Att C - Economic Vitality Change Matrix - Other (PDF)
  83. 2021_09_08 - Att D - Transportation Change Matrix - Other (PDF)
  84. 2021_09_08 - Memo - Other Element Updates (PDF)
  85. 2021_09_08 - Presentation - Presentation Slides (PDF)
  86. 2021_09-29 - Att A - Overlake Policy Change Matrix Draft 1.0 (PDF)
  87. 2021_09-29 - Memo - Overlake Policy Options (PDF)
  88. 2021_09-29 - Presentation - Overlake Policy Options Part 1
  89. 2021_10-13 - Memo - Overlake Policy Options (PDF)
  90. 2021_10-13 - Memo Attachment A - Overlake Options and Alternatives (PDF)
  91. 2021_10-13 Overlake Policy Options
  92. 2021_10-27 - Memo - CVA Briefing (PDF)
  93. 2021_10-27 - Memo - Redmond 2050 Monthly Update (PDF)
  94. 2021_10-27 - Presentation - Climate Vulnerability
  95. 2021_11-10 - Memo - Redmond 2050 Monthly Update (PDF)
  96. 2021_11-10 - Presentation - Redmond 2050 Monthly Briefing (PDF)
  97. 2021_12-15 - Memo - Redmond 2050 Monthly Update (PDF)
  98. 2021-06-30 - Memo - Redmond 2050 Monthly Update (PDF)
  99. 2021-06-30 - Presentation - SEPA Begins (PDF)
  100. 2021-07-28 - Memo - Redmond 2050 Monthly Update (PDF)
  101. 2021-07-28 - Memo Attachment A - Inclusive Design Resources (PDF)
  102. 2021-07-28 - Memo Attachment B - NW Universal Design Council Brochure (PDF)
  103. 2021-07-28 - Memo Attachment C - UD Principles and Guidelines (PDF)
  104. 2021-08-11 - Redmond 2050 Monthly Update (PDF)
  105. 2021-08-25 - DRAFT Redmond 2050 Monthly Update (PDF)
  106. 2021-09_29 - Memo - Regulatory Updates (PDF)
  107. 2021-09_29 - Memo - Redmond 2050 Monthly Update (PDF)
  108. 2022_01-26 - Redmond 2050 Monthly Update - Attachment A - Presentation (PDF)
  109. 2022_01-26 - Redmond 2050 Monthly Update - Memo (PDF)

ANNUAL DOCKET

2021-2020 Docket Review

  1. 2021_01-13 - Memo - Comp Plan Fee & Docket Item Update
  2. 2021_01-13 - Presentation - Comp Plan Fee & Docket Item Update
  3. 2021_03-31 - Memo - Docket Schedule (PDF)
  4. 2021_03-31 - Memo - Sewer Plan update (PDF)
  5. 2021_03-31 - Memo Attachment A - Executive Summary (PDF)
  6. 2021_03-31 - Memo Attachment B - Comp Plan policies (PDF)
  7. 2021_03-31 - Presentation - Sewer Plan Update (PDF)
  8. 2021_04-14 - Memo - 20-21 Docket - Package 1
  9. 2021_04-14 - Presentation - Annual Docket - revised
  10. 2021_04-14 Attachment A - Retail Marijuana Expansion Alternative 1 (PDF)
  11. 2021_04-14 Attachment B - Retail Marijuana Expansion Alternative 2 (PDF)
  12. 2021_04-14 Attachment C - Economic Vitality Amendment - Affordable Commercial Space (PDF)
  13. 2021_04-14 Attachment D - Housing Element Amendment - Affordable Housing (PDF)
  14. 2021_04-14 Planning Commission Presentation Annual Docket (PDF)
  15. 2021_04-21 Memo - Sewer Plan update (PDF)
  16. 2021_04-21 - Memo Attachment C - Comp Plan policies (PDF)
  17. 2021_04-21 _Presentation_ General WW Plan Update (PDF)
  18. 2021_04-28 - 2021 Annual Docket - Presentation (Revised)
  19. 2021_04-28 - 2021 Docket - Memo - Package 2 (PDF)
  20. 2021_04-28 - 2021 Docket - Memo Attachment A - Neighborhoods and Land Use Element Update (PDF)
  21. 2021_04-28 - 2021 Docket - Presentation (PDF)
  22. 2021_04-28 - 2022 Docket - Memo - Initial Briefing to PC (PDF)
  23. 2021_04-28 - 2022 Docket - Memo Attachment A - RTC Materials (PDF)
  24. 2021_04-28 - 2022 Docket - Memo Attachment B - CIM Group Materials (PDF)
  25. 2021_04-28 - 2022 Docket - Memo Attachment C - Evans Creek Relocation Materials (PDF)
  26. 2021_04-28 - 2022 Docket - Presentation (PDF)
  27. 2021_05_26 - Memo - Sewer Plan update (PDF)
  28. 2021_05_26 - Memo Attachment A - Tech Committee Report (PDF)
  29. 2021_05_26 - Memo Attachment B - Sewer Plan update Q and A (PDF)
  30. 2021_05-12 - Memo - 20-21 Docket - Retail Marijuana Sales (PDF)
  31. 2021_05-12 - Memo Attachment A - FAQ and Location Considerations (PDF)
  32. 2021_05-12 - Presentation - Retail MJ Expansion - rev
  33. 2021_05-12 - Presentation - Retail MJ Expansion (PDF)
  34. 2021_05-26 - Memo - 2021 Docket - Education Hill and LU Designation Amendment (PDF)
  35. 2021_05-26 - Memo - 2022 Docket Applications (PDF)
  36. 2021_05-26 - Memo - Public Safety Functional Plan Update (PDF)
  37. 2021_05-26 - Memo Attachment A - Ordinance 2579 Map (PDF)
  38. 2021_05-26 - Memo Attachment B - Ordinance 2930 Map (PDF)
  39. 2021_05-26 - Presentation - 2022 Docket (PDF)
  40. 2021_05-26 - Presentation - Education Hill Land Use Designation Change (PDF)
  41. 2021_06_09 - 2021 Docket - Memo - Sewer Plan update (PDF)
  42. 2021_06_09 - 2021 Docket - Memo Attachment A - Draft PC Report (PDF)
  43. 2021_06_09_21 - 2021 Docket - Retail Marijuana Presentation (PDF)
  44. 2021_06_09_21 - 2021 Docket - Retail Marijuana Public Hearing Memo (PDF)
  45. 2021_06_09_21 - 2021 Docket - Retail Marijuana Tech Committee Report (PDF)
  46. 2021_06_09_21 - 2021 Docket - Retail Marijuana Tech Report Exhibit A - Staff Analysis (PDF)
  47. 2021_06_09_21 - 2021 Docket - Retail Marijuana Tech Report Exhibit B - Comp Plan Amendments (PDF)
  48. 2021_06_09_21 - 2021 Docket - Retail Marijuana Tech Report Exhibit C - Zoning Code Amendments (PDF)
  49. 2021_06_09_21 - 2021 Docket - Retail Marijuana Tech Report Exhibit D - SEPA Determination (PDF)
  50. 2021_06_16 - 2021 Docket - Memo Attachment B - Tech Report Exhibit A - Staff Analysis (PDF)
  51. 2021_06_16 - 2021 Docket - Memo Attachment C - Tech Report Exhibit B - Comp Plan Amendments (PDF)
  52. 2021_06_16 - 2021 Docket - Memo Attachment D - Tech Report Exhibit C - SEPA 202100349 (PDF)
  53. 2021_06_16_21 - 2021 Docket - Memo - Retail Marijuana Public Hearing Memo (PDF)
  54. 2021_06_16_21 - 2021 Docket - Memo Attachment A - 06-16-21 Issues Matrix (PDF)
  55. 2021_06_16_21 - 2021 Docket - Memo Attachment B - 03-23 16 Issues Matrix for 2016 Amendments(PDF)
  56. 2021_06-16 - 2021 Docket - Memo - Education Hill and LU Designation Amendment (PDF)
  57. 2021_06-16 - 2021 Docket - Memo Attachment A - Technical Committee Report (PDF)
  58. 2021_06-16 - 2021 Docket - Presentation - Education Hill - revised
  59. 2021_06-16 - 2021 Docket - Presentation - Education Hill (PDF)
  60. 2021_06-16 - Applicant Presentation - 2022 Docket - CIM
  61. 2021_06-16 - Applicant Presentation - 2022 Docket - RTC
  62. 2021_06-16 - Applicant Testimony - 2022 Docket - Evans Creek
  63. 2021_06-16 - Applicant Testimony - 2022 Docket - Public Safety
  64. 2021_06-16 - Memo - 2022 Docket Public Hearing (PDF)
  65. 2021_06-16 - Presentation - 2022 Docket - revised
  66. 2021_06-16 - Presentation - 2022 Docket (PDF)
  67. 2021_06-30 - 2021 Docket - Affordable Commercial PC Report (PDF)
  68. 2021_06-30 - 2021 Docket - Affordable Commercial PC Report Attachment A - Tech Committee Report (PDF)
  69. 2021_06-30 - 2021 Docket - Affordable Commercial PC Report Attachment B - PH Notice (PDF)
  70. 2021_06-30 - 2021 Docket - Affordable Housing PC Report (PDF)
  71. 2021_06-30 - 2021 Docket - Affordable Housing PC Report Attachment B - PH Notice (PDF)
  72. 2021_06-30 - 2021 Docket - Memo - Affordable Housing and Affodable Commercial - revised
  73. 2021_06-30 - 2021 Docket - Memo - Affordable Housing and Affodable Commercial (PDF)
  74. 2021_06-30 - 2021 Docket - Presentation - Affordable Housing and Affordable Commercial (PDF)
  75. 2021_06-30 - 2022 Docket - PC Report (PDF)
  76. 2021_06-30 - 2022 Docket - PC Report (PDF)
  77. 2021_06-30 - 2022 Docket - PC Report Attachment A - Applications (PDF)
  78. 2021_06-30 - 2022 Docket - PC Report Attachment A - Applications (PDF)
  79. 2021_06-30 - 2022 Docket - PC Report Attachment B - Staff Analysis (PDF)
  80. 2021_06-30 - 2022 Docket - PC Report Attachment B - Staff Analysis (PDF)
  81. 2021_06-30 - 2022 Docket - PC Report Attachment C - Applicant Testimony Materials (PDF)
  82. 2021_06-30 - 2022 Docket - PC Report Attachment C - Applicant Testimony Materials(PDF)
  83. 2021_06-30 - 2022 Docket - PC Report Attachment D - Public Hearing Notice (PDF)
  84. 2021_06-30 - 2022 Docket - PC Report Attachment D - Public Hearing Notice (PDF)
  85. 2021_06-30 - PC Report - Retail Marijuana Sales (PDF)
  86. 2021_06-30 - PC Report Attachment A - Issues Matrix (PDF)
  87. 2021_06-30 - PC Report Attachment B - Public Comment Matrix (PDF)
  88. 2021_06-30 - PC Report Attachment C - Tech Report w attachments (PDF)
  89. 2021_06-30 - PC Report Attachment D - Public Notice (PDF)
  90. 2021_06-30- 2021 Docket - Presentation - Education Hill
  91. 2021_06-30 -2021 Docket Affordable Housing PC Report Attachment A - Tech Committee Report (PDF)
  92. 2021_07-07 - 2021 Docket - Ed Hill - PC Report (PDF)
  93. 2021_07-07 - 2021 Docket - Ed Hill - PC Report Attachment A - Issues Matrix (PDF)
  94. 2021_07-07 - 2021 Docket - Ed Hill - PC Report Attachment B - Public Comment and Applicant Testimony (PDF)
  95. 2021_07-07 - 2021 Docket - Ed Hill - PC Report Attachment B - Public Comment and Applicant Testimony_Redacted (PDF)
  96. 2021_07-07 - 2021 Docket - Ed Hill - PC Report Attachment C - Technical Committee Report (PDF)
  97. 2021_07-07 - 2021 Docket - Ed Hill - PC Report Attachment D - Staff Analysis (PDF)
  98. 2021_07-07 - 2021 Docket - Ed Hill - PC Report Attachment E - Public Notice (PDF)
  99. 6_30-16 - 2021 Docket - Memo - Education Hill and LU Designation Amendment (PDF)
  100. PlanningCommissionDocketSchedule

CODE REVISIONS

Annual Docket Process [CODE REVISION]

  1. 2020_05-13 - Memo - Docket Process Revisions (PDF)
  2. 2020_05-13 - Memo Attachment - Current Code RZC 21.76.070.J (PDF)
  3. 2020_05-13 - Memo Attachment - Docket White Paper (PDF)
  4. 2020_05-13 - Memo Attachment - PC Meeting Summary 07-24-19 (PDF)
  5. 2020_05-13 - Memo Attachment - PC Meeting Summary 10-23-19 (PDF)
  6. 2020_05-13 - Memo Attachment - Presentation on Docket from PC 10-23-19 (PDF)
  7. 2020_06-10 - Memo (PDF)
  8. 2020_06-10 - Memo Attachment A - Considerations for Amending RZC 21.76.070 (PDF)
  9. 2020_06-10 - Memo Attachment B - Proposed Code Revisions (PDF)
  10. 2020_06-10 - Memo Attachment C - Matrix (PDF)
  11. 2020_06-10 - Presentation (PDF)
  12. 2020_06-24 - Memo (PDF)
  13. 2020_06-24 - Memo Attachment A - Comments and Suggestions (PDF)
  14. 2020_06-24 - Presentation (PDF)
  15. 2020_07-08 - Memo (PDF)
  16. 2020_07-08 - Memo Attachment - Tech Report - RZC Docket Process Code Rewrite (PDF)
  17. 2020_07-08 - PC Issues Matrix (PDF)
  18. 2020_07-20 - Tech Report with Exhibits (PDF)
  19. 2020_07-22 - Memo (PDF)
  20. 2020_07-22 - Memo Attachment B - Proposed Code - clean copy (PDF)
  21. 2020_07-22 - Memo Attachment C - PC Issues Matrix (PDF)
  22. 2020_07-22 - Report Attachment A - Proposed Code - RZC redline (PDF)
  23. 2020_08012 - Report Attachment B - Recommended Code - Clean Copy (PDF)
  24. 2020_08-12 - PC Report (PDF)
  25. 2020_08-12 - Report Attachment A - Recommended Code - RZC redline (PDF)
  26. 2020_08-12 - Report Attachment C - Minutes and Meeting Summaries (PDF)
  27. 2020_08-12 - Report Attachment D - Final Issues Matrix (PDF)
  28. 2020_08-12 - Report Attachment E -Explanation of Proposed Code Revisions (PDF)