PPE Management - Storage and Extractors

Slide1

Project Overview

The PPE Management—Storage Extractors project aims to improve functionality and safety standards across several fire stations. The project includes key tasks such as installing lockers and extractors, plumbing fixtures, sanitary and supply lines, ventilation systems, and window tints at the Fire Stations. Additionally, the project will repurpose the existing areas within these fire stations to create space for personal protective equipment (PPE) storage racks, improved lighting, and adequate ventilation.
The ultimate objective is to provide adequately ventilated and dry storage areas for PPE, allowing firefighters to clean and maintain their gear on-site, thereby minimizing disruptions to their workflow. 



Sign Up For Our Newsletter

  1. Redmond Washington Homepage

Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow