Project Overview

Bear Creek slowly migrated into the Avondale Road embankment north of Novelty Hill Road causing the embankment to settle and undercut the sidewalk.

This project restored and enhanced a section of Bear Creek by re-channeling it, installing large woody debris, creating a side channel or backwater habitat, and restoring the buffer with native plantings. As part of the restoration, existing riprap boulders and a PSE guidewire were removed.

The project also stabilized the embankment and repaired existing stormwater outfalls that were damaged.