Bear Creek Mitigation for NE 95th St Bridge

Photo of completed Bear Creek at 95th work

Project Overview

This project enhanced approximately 680 feet of Bear Creek habitat downstream from the NE 95th Street bridge by:

  • Installing large woody material in the stream banks and channel
  • Grading the bank to create alcoves and gentler slopes
  • Planting native trees and shrubs

Photo of Bear Creek at NE 95th with approximate project area outlined