Project Background

Project Events

Environmental Review

Related Documents

Related Projects

Contact Us

 


Overlake Neighborhood  
Draft Supplemental Environmental Impact Statement (SEIS)

The City of Redmond issued the Overlake Neighborhood Plan Update and Implementation Project Draft SEIS on Friday, March 23, 2007.  Please see below for ways to obtain a copy of the document.

Location:  The neighborhood is bounded on the west by 148th Avenue NE, on the north by NE 60th Street and State Route (SR) 520, and on the east by West Lake Sammamish Parkway and Bellevue-Redmond Road, which also forms the southern boundary with NE 20th Street.

File Number:  L070107

Description:  This Draft SEIS is being issued by the City of Redmond and analyzes impacts associated with the No Action Alternative and Action Alternative for potential future land use changes and public investments for the Overlake Neighborhood through 2030.  The two alternatives largely maintain the vision adopted in 1999 as part of the Overlake Neighborhood Plan, but differ in describing how the vision is achieved by 2030.  These differences include the amount and character of residential and commercial development and the level of public action and investment taken, such as investment in transportation, parks and open space, and stormwater management improvements.  The proposed Action Alternative includes the adoption of updates to the Overlake Neighborhood Plan (ONP), related portions of Redmond's Comprehensive Plan, the Redmond Community Development Guide (RCDG), and other implementation documents, such as the Redmond Transportation Master Plan.

Proponent:  City of Redmond

Comments:  Agencies, affected tribes, and members of the public are invited to comment.  Comments should be as specific as possible and may address either the adequacy of the document or the merits of the alternatives or both.  You may comment on the methodology, alternatives, elements of the environment, mitigation measures, probable significant impacts and potential conditions on any licenses or approvals to be considered by the City.

Comment Period Ends: Comments on the Draft SEIS may be submitted in writing through April 23, 2007, 5pm, and should be addressed to: Rob Odle, Responsible Official, City of Redmond Planning Department, PO Box 97010, MS: 4SPL, Redmond WA 98073-9710  Comments may also be submitted by email to overlake@redmond.gov. 

Responsible Officials: 
Rob Odle, Planning and Community Development Department Director
Bill Campbell, Interim Public Works Director
City of Redmond Planning Department
PO Box 97010, MS: 4SPL
Redmond WA 98073-9710

Lead Agency Contact: 
Lori Peckol
Phone: 425-556-2411
Email: lpeckol@redmond.gov

To Obtain the Draft SEIS Document:  Paper copies may be purchased for $10 at the Permit Center at Redmond City Hall (2nd Floor), 15670 NE 85th Street, Redmond, WA.  Compact discs with the Draft SEIS in electronic form are also available at no charge.  Electronic copies may be downloaded from this site

Overlake Neighborhood Plan Draft SEIS
Cover Pages and Table of Contents
Introduction and Summary
Overlake Neighborhood Plan Alternatives
Environmental Analysis of the Alternatives
Comments, Responses, Distribution, Acronyms
Appendix A: Draft Comp Plan Update
Appendix B: Draft RCDG Update
Appendix C: Draft Master Plan
Appendix D: 2030 Land Use Alternatives
Appendix E: Transportation Technical Supporting Record
Appendix F: Air Quality Technical Supporting Record