|
CHAPTER |
 |
TITLE |
 |
PAGE |
 |
|
|
|
INTRODUCTION |
|
1 |
| PART I |
|
ORIENTATION |
|
5 |
| 1 |
|
Modifications to the Department of
Ecology Manual |
|
7 |
| 2 |
|
Local Design Practices |
|
15 |
| 3 |
|
Project Classification in Redmond
(Small or Large) |
|
19 |
 |
| PART II |
|
SMALL PROJECTS |
|
23 |
| 4 |
|
Small Projects: Fees and Permit
Process |
|
25 |
| 5 |
|
Small Projects: Application Requirements |
|
29 |
| 6 |
|
Small Projects: Construction
Documents |
|
31 |
 |
| PART III |
|
LARGE PROJECTS |
|
33 |
| 7 |
|
Large Projects: Fees and Permit
Process |
|
35 |
| 8 |
|
Large Projects: Application Requirements |
|
41 |
| 9 |
|
Large Projects: Construction
Documents |
|
43 |
| 10 |
|
Rough Grading Permits |
|
45 |
 |
| PART IV |
|
DESIGN
INFORMATION |
|
47 |
| 11 |
|
Design Goals |
|
49 |
| 12 |
|
Detailed Design Standards |
|
51 |
| 13 |
|
General Temporary Erosion and Sediment Control (TESC)
Strategies |
|
57 |
| 14 |
|
Detailed Temporary Erosion and
Sediment Control (TESC) Standards |
|
69 |
| 15 |
|
Standards for Engineering Drawings |
|
75 |
 |
| |
|
APPENDICES
|
|
77 |
| A-1 |
|
Stormwater Management Code (CDG20.E.90.10.020) |
|
79 |
| A-2 |
|
Forms |
|
81 |
| A-3 |
|
Standards Notes |
|
91 |
| A-4 |
|
Plan Review Checklists |
|
93 |
|
|
|
|
|