Contact 425-556-2840 for additional details pertaining to forms,
fees, or administrative requirements for developer utility system
extensions.
CONSTRUCTION
DRAWINGS
Construction drawings for water improvements shall be prepared in
accordance with the Design Requirements for Water and Sewer System
Extensions prepared by the
Water/Wastewater Division of the Department of
Public Works.
AGENCY APPROVALS
Construction drawings for water improvements may need to be reviewed and
approved by DSHS prior to construction.
EASEMENTS
Easements shall be provided for all water improvements as required in
the Design
Requirements. Offsite easements must be recorded prior to
construction drawing approval. Onsite easements must be recorded prior
to the improvements being placed into operation.
PERFORMANCE GUARANTEE
A performance guarantee shall be provided in a form acceptable to the
City for water improvements as follows:
Plats and short plats:
-
All water improvements within
City right-of-way or easement and any other portion of the
improvements as required by the Water/Wastewater Division.
-
For any improvements not
completed at time of recording of the plat or short plat.
Apartments, condominiums and
commercial projects:
-
All water improvements in City
rights-of-way or easement and any other portion of the improvements
as required by the Water/Wastewater Division.
-
For any improvements not
completed at time of issuing meters or permits for occupancy.
The amount of the performance guarantee shall be established by the
City upon review of estimates prepared by the applicant and the
guarantee shall be provided prior to plan approval.
BILL OF SALE
A Bill of Sale shall be provided for all water improvements to be owned
and operated by the City.
ASSET SUMMARY
A Developer Extension Asset Summary shall be provided for all water
improvements to be owned and operated by the City.
MAINTENANCE GUARANTEE
A maintenance guarantee shall be provided in a form acceptable to the
City for all water improvements to be owned and operated by the City.
The period of guarantee shall be one (1) year from acceptance of all improvements
by the City.
AS-BUILT DRAWINGS
As-built utility drawings shall be submitted to the City prior to the
improvements being placed in operation.
PERMIT APPLICATIONS
Water meter applications shall be submitted for approval to the
Water/Wastewater Division. Meters will not be issued until all improvements are
constructed and administrative requirements are complete. Requests to
install water meters prior to completion of all water improvements and
administrative requirements will only be approved on a case by case
basis after review of the project specifics. Various additional
guarantees or requirements may be imposed as determined by the
Water/Wastewater Division for issuance of meters prior to improvements or administrative
requirements being completed. All reimbursement fees shall be paid prior
to sale of water and side sewer permits. Reimbursement fees may be
required prior to plat or short plat recording.
|