Contact 425-556-2840 for additional details pertaining to forms,
fees, or administrative requirements for developer utility system
extensions.
CONSTRUCTION
DRAWINGS
Construction drawings for sewer improvements shall be prepared in
accordance with the Design Requirements for Water and Sewer System
Extensions prepared by the Development Services Division of the Department of
Public Works.
AGENCY APPROVALS
Construction drawings for sewer improvements shall be reviewed and
approved by Metro and DOE prior to construction.
EASEMENTS
Easements shall be provided for all sewer improvements as required in
the Design
Requirements. Offsite easements must be recorded prior to
construction drawing approval. Onsite easements must be recorded prior
to the improvements being placed into operation.
PERFORMANCE GUARANTEE
A performance guarantee shall be provided in a form acceptable to the
City for sewer improvements as follows:
Plats and short plats:
-
All sewer improvements within
City right-of-way or easement and any other portion of the
improvements as required by the Development Services Division.
-
For any improvements not
completed at time of recording of the plat or short plat.
Apartments, condominiums and
commercial projects:
-
All sewer improvements in City
rights-of-way or easement and any other portion of the improvements
as required by the Development Services Division.
-
For any improvements not
completed at time of issuing meters or permits for occupancy.
The amount of the performance
guarantee shall be established by the City upon review of estimates
prepared by the applicant and the guarantee shall be provided prior to
plan approval.
BILL OF SALE
A Bill of Sale shall be provided for all sewer improvements to be owned
and operated by the City.
ASSET SUMMARY
A Developer Extension Asset Summary shall be provided for all sewer
improvements to be owned and operated by the City.
MAINTENANCE GUARANTEE
A maintenance guarantee shall be provided in a form acceptable to the
City for all sewer improvements to be owned and operated by the City.
The period of guarantee shall be one (1) year from acceptance of all improvements
by the City.
AS-BUILT DRAWINGS
As-built utility drawings shall be submitted to the City prior to the
improvements being placed in operation.
PERMIT APPLICATIONS
Side sewer permit applications shall be submitted for approval to the
Development Services Division. Permits will not be issued until all improvements are
constructed and administrative requirements are complete. Requests to
construct side sewers prior to completion of all sewer improvements and
administrative requirements will only be approved on a case by case
basis after review of the project specifics. Various additional
guarantees or requirements may be imposed as determined by the
Development Services Division for issuance of permits prior to improvements or administrative
requirements being completed. All reimbursement fees shall be paid prior
to sale of water and side sewer permits.
Reimbursement fees may be
required prior to plat or short plat recording.
|