Project Location: Sammamish Valley
The City contracted with a consultant to prepare a
Master Plan for this site. The consultant recently completed gathering data
about the site, including reviewing historical records, conducting a
wetland delineation, and a topographic survey. This data will provide us
with basic information that is being used to determine
programming and development options for the site. A public
involvement process began in July to solicit ideas on how to design a
public park space at this location. The presentation from this
meeting is provided in the document library. In September, the project
team met with the public to present three
alternative designs for the park and to seek opinions on the
preferred alternative.The final master plan is being developed and will
undergo SEPA review in the Spring of 2010.
Project Manager: Carolyn Hope, Senior Park Planner
PHONE: 425-556-2313
EMAIL:
cjhope@redmond.gov
|