Project Location: North Redmond
The first public meeting to present results of a site
investigation, and get input from the neighborhood residents was held
March 11, 2009. About 15 residents attended the meeting.
Site Investigation
The site investigation revealed that there are two Category III wetlands
present on this 5 acre site. Wetland A, along the stream and pond,
is .90 acre in size, and a 75 foot wide wetland buffer is required.
Wetland B, on the west side of the property, is .43 acre in size, and
requires a 40 foot wide buffer. When this is mapped out, it leaves
a relatively limited area which can be developed with park facilities.
Consultant Presentation
Nakano Associates, landscape architects; ESA Adolfson, environmental
planners; and Kristin Tollefson, artist; provided a PowerPoint
presentation that illustrated:
1) The wetland issues
2) The wildlife habitat value of the site
3) The need to increase the interaction of
children with nature
Citizen Input
The majority of residents who attended the meeting appreciated
the environmental limitations of the site, and was supportive of working
in a sensitive manner in the future development of the park.
Citizens also voiced interest in having the City explore purchasing the
5 acre parcel to the east of the site.
Residents provided the following list of desired activities or features:
- Covered picnic area
- Climbing and walking rocks
- Splash park
- Rope structure
- Play structure friendly to the environment
- Amphitheatre/gathering place
- Water contact
- Swings
- Elements for discovery, surprise
- Natural rocks
- Walking paths
- Preservation and education about history of the place and nature
- Seating for quiet contemplation and observation
- Nature gathering spot
- Walking / exercise stations
- Wooden fort
Next Steps
A draft Master Plan, based on the input received at the last meeting
will be presented. Plans for implementing some temporary trail and
play features this summer will be discussed.
June 24, 2009 ~ 7:00 pm
Rockwell Elementary
Library
11125 162nd Avenue NE, Redmond
Project Manager: B Sanders, Senior Park Planner
PHONE: 425-556-2328