City of Redmond HomeContact UsEmploymentEvents CalendarSearch
Connecting Redmond
Policies & PlansProjectsResourcesFrequently Asked QuestionsStudies


Policies & Plans

TMP Documents


Transportation Master Plan

NOTE: Chapter 7. Performance Monitoring System establishes the performance monitoring system that will be used by the City to track implementation of the Transportation Master Plan (TMP).  Multimodal objectives and concurrency standards will be tracked through an Annual Mobility Report Card and a Five Year Transportation Status Report.

The City will use these reports to provide accurate information to the public about the City's progress implementation of the TMP and the current condition of the transportation system.  This will also set the stage for future updates of the TMP.

Click on the link to read the results of the 2008 Annual Mobility Report Card

Downtown Transportation Master Plan

The City of Redmond has a vision to reclaim our downtown as an economically healthy, people-friendly place, enhanced by the movement of pedestrians, bikes, cars, and a diversity of businesses that is outlined in the Comprehensive Plan.  The Downtown Transportation Master Plan effort that started in 2001 created a concept with specific implementation actions that would achieve this vision.  Following are links to the different segments of The Results, which is the Downtown Transportation Master Plan document:

 

TMP Documents: Table of Contents

The links below are pdf formatted pages. (If you need to, obtain the free Acrobat Reader to view and print.)

PART TITLE  
    PRELIMINARY  
  Table of Contents    
List of Figures  
  Executive Summary    
1   INTRODUCTION    
  Introduction    
2   VISION, FRAMEWORK AND POLICIES    
    Pages 2-1 to 2-10    
3   TRENDS & CONDITIONS  
    Pages 3-1 to 3-10    
4   TRANSPORTATION ELEMENT OBJECTIVES AND STANDARDS
Pages 4-1 to 4-12 
5   TRANSPORTATION MODE PLANS  
5A Pedestrian Program Plan (around 1 meg in size)  
5B   Bicycle System Plan (around 1 meg in size)    
5C   Transit System Plan (around 2 megs in size)    
5D   Thoroughfare Plan (around 1 meg in size)    
5E   Modal Integration: Access and Circulation    
5F   Demand Management    
 6 TRANSPORTATION FACILITIES PLAN
Pages 6-1 to 6-16   
7 PERFORMANCE MONITORING SYSTEM
Pages 7-1 to 7-22  
8 REGIONAL TRANSPORTATION  
Pages 8-1 to 8-5  
9 THREE-YEAR PRIORITY ACTION PLAN  
Pages 9-1 to 9-7  
10 APPENDICES  
Buildout Transportation Facilities Plan  
    Glossary    
    List of Acronyms