Central Connector Rendering
Concept Sample 1

Rendering Sample 2

Project Phase: In Construction
Estimated Timeline: Fall 2012 - Summer 2013

 

Concept Sample 2
Concept Sample 3

OVERVIEW

Project Vicinity Map

Redmond secured four miles of the Eastside Rail Corridor and adjacent properties in 2010 as part of a regional partnership to develop a regional trail system and provide access for regional utilities and light rail. This corridor, the Redmond Central Connector, is the artery of the City that links Sammamish, Redmond, and Kirkland and knits together Redmond Town Center, historic Downtown, Grass Lawn neighborhood, and Willows business district. The Connector will revitalize 30 acres of prime real estate in Redmond and draw new commercial, retail, and office activity, and hundreds of thousands of new visitors to Redmond

This new regional trail will also provide safety enhancements to pedestrians traveling in Downtown and along Willows Road. In addition, it will provide an alternate route to the Sammamish River Trail, which is heavily used in Redmond, for people to use for recreation or transportation.

The public was engaged in the development of a master plan for a regional trail for the corridor in 2010-2011. The trail is being constructed in multiple phases:

Phase I - Completed in 2013.

This one mile segment is located in Downtown, extending from the Bear Creek Trail by SR 202 and Redmond Way to the Sammamish River Trail.


Phase II - In design with plans to start construction in 2015.

A 1.3 mile extension of the trail from east of the Sammamish River to the 9900 Block along Willows Road, near Digipen Institute of Technology and the Overlake Christian Church.



Phase III - Not currently funded.

The last 1.6 miles of trail would connect Redmond to Kirkland and Woodinville across NE 124th Street. The City, Kirkland, and King County are also exploring options to create a more direct route from Redmond to Totem Lake via Willows Road to the Eastside Rail Corridor, along Willows Road or NE 124th Street. This phase is not currently funded; however, the City would like to prioritize this project in order to improve active transportation modes to offices on Willows and to Kirkland.

Redmond Central Connector Public Art


Erratic

Signals

Sky Painting
 

Contact Us CONTACT

Mike Haley, PE
Project Manager
425-556-2723

Document Library DOCUMENT LIBRARY

Overview

RCC Phase II RFP Presentation 

Deliverables

Design of Phase 1
(Downtown Mile)

Commissioned Art for the Project

Final Plans - Bid Documents

Plan Set
Specifications Part 1
Specifications Part 2

Easement Map

Bridge Inspection Report

Final Master Plan

Online Review Version

Part 1
Part 2
Part 3
Part 4
Part 5
Part 6
Appendix A - Infrastructure Alignment Plan
Appendix A.1
Appendix A.2
Appendix A.3
Appendix A.4
Appendix A.5
Appendix A.6
Appendix A.7
Appendix B - Planning Review
Appendix C - Art Integration
Appendix D - Public Involvement Summary
Appendix E - Trolley Study
Appendix F - SEPA Checklist
Appendix G - Cost Estimate

Presentations

Planning Commission 95% Design - July 11, 2012
Final Master Plan Summary - May 2011
Presentation to City Council - Apr 12, 2011
Historical Society on Draft Master Plan - Apr 5, 2011
Arts Commission Meeting on Draft Master Plan - Mar 10, 2011
Public Meeting on Draft Master Plan Design - Jan 27, 2011
Planning Commission Meeting on Draft Master Plan - Jan 26, 2011
Joint Commission
Meeting about Conceptual Design - Dec 2, 2010
Public Meeting on Conceptual Design - Nov 15, 2010
Council Study Session
on Infrastructure Alignment Plan - Oct 12, 2010
Council Study Session on Infrastructure Alignment Plan - Sep 14, 2010 
Presentation to Parks & Trails Commission with Pedestrian Bicycle Advisory Committee and Planning Commission - Visioning Process - Sep 2, 2010 
Presentation to Planning Commission - Master Plan Overview - Aug 18, 2010 
City Council Presentation - Mar 9, 2010

Background Information

BNSF Video
Memorandum of Understanding to Acquire BNSF Corridor November 2009 
Downtown East-West Corridor Study (transportation projects in the Corridor)

Maps

BNSF Corridor 
Downtown Study Area
Sammamish Valley Study Area 

Links