Red-Wood Road Channel Stabilization and Culvert Repair

Vicinity Map

Location: 9800 block of Red-Wood Road and ravine between Red-Wood Road and 160th Ave NE

Project Phase: Construction complete

Contact: Bassam Al-Ali, 425-556-2743

Page Last Updated: 11/14/18

Description:
This project repaired erosion and stability issues in the ravine between Red-Wood Road and 160th Avenue NE, at NE 98th Street. It also replaced broken pipes in the culvert under Red-Wood Road and enhanced maintenance access to the existing manhole structure at the bottom of the ravine.

Stabilized slope