134th Ave Sidewalk Improvements

Location: 134th Ave. NE from NE 75th St. to NE 80th St.

Project Phase: Design

Estimated Timeline: Construction is expected to begin in Winter2017 and be completed in Summer 2018

Project Manager: Peter Dane, 425-556-2816

Page Last Updated: 8/30/17

Description:
As part of the Safe Routes to School program, the City of Redmond is designing a complete sidewalk on the east side of 134th Ave NE from NE 75th St. to NE 80th St. The project includes sidewalk, lighting and a flashing beacon pedestrian crossing at NE 80th St.

134th Ave Sidewalk Project Location Map