Stormwater
Standard Detail
Section 6
Revision Date Redmond Standard Plan WSDOT Standard Plan
       
Concrete Inlet     6/1/06 B-25.60-00
Concrete Basin - Type 1  6/1/06 B-5.20-00 
Concrete Basin - Type 1L  6/1/06 B-5.40-00
Catch Basin - Type 2 6/1/06   B-10.20-00
Typ. Orientation of Type 2 Catch Basin in City Street 3/1/17 609A  
Typical Catch Basin Placement 3/1/17 609B  
Detention System Control Structure 3/1/17 610                              
Solid Metal Cover for Catch Basin  11/21/06   B-30.20-01
Miscellaneous Details for Drainage Structures  9/20/07   B-30.90-01
Manhole Type 3 6/1/06   B-15.60-00
Stormwater Valve  3/1/17 611  
Valve Box Extension 3/1/17 612  
Stormwater Shear Gate 3/1/17  613   
Stormwater Manhole/Catch Basin Adjustment Detail  3/1/17 615  
Detention Vault Access Manhole Lid Over Low Point 3/1/17 616  
Filter Vault Access 3/1/17 617A  
Thru-Curb Inlet Frame Installation 3/1/17 618  
Combination Inlet  6/1/06   B-25.20-00
Rectangular Vaned Grate 6/1/06   B-30.30-00
Rectangular Herringbone Grate 6/1/06   B-30.50-00
Headwall & Rip Rap 3/1/17 620  
Lot Drain Trench 3/1/17 621  
Stenciling Detail 3/1/17 622  
Sidewalk Underdrain System 3/1/17 630  
Catch Basin Frame and Grate Replacement 3/1/17 631  
Rectangular Frame (Reversible) 6/8/06   B-30.10-00
Soil Amendment and Depth 3/1/17 632  
Permeable Pavement Section 3/1/17 643  
Pervious Sidewalk Alternative Design 3/1/17 645  
Pervious Concrete Sidewalk 3/1/17 646  
Permeable Pavement on Slopes 3/1/17 647  
Roof Rain Harvesting 3/1/17 650  
Bioretention Facility 3/1/17 655  
Bioretention Plant Palette 3/1/17 657  
Bioretention Curb Extension 3/1/17 659  
Bioretention Check Dam 3/1/17 661  
Bioretention In-line Curb Cut 3/1/17 663  
Bioretention Side Curb Cut 3/1/17 665  
Bioretention Outlet Structure 3/1/17 667  
Bioretention Clean-Out 3/1/17 669  
Bioretention Hydrant Access 3/1/17 671  
Perforated Pipe Connection 3/1/17 673  


The links above include PDF pages. You may obtain the free Acrobat Reader to view and print.