Clearing, Grading & Temporary Erosion Control
Standard Detail
Section 5
Revision Date Redmond
Standard Plan
WSDOT Standard Plan
       
Filter Fabric Fence 7/1/15 502  
Stabilized Construction Entrance 3/1/17 503  
Temporary Swale 3/1/17 504  
Earth Dike 3/1/17 505  
Perimeter & Dike/Swale 3/1/17 506
Storm Drain Inlet Protection 6/30/07   I-40.20-00
High Visibility Fence 8/11/09   I-10.10-01

The links above include PDF pages. You may obtain the free Acrobat Reader to view and print.