Stormwater
Standard Detail
Section 6
Revision Date Redmond Standard Plan WSDOT Standard Plan
       
Concrete Inlet     6/1/06 B-25.60-00
Concrete Basin - Type 1  6/1/06 B-5.20-00 
Concrete Basin - Type 1L  6/1/06 B-5.40-00
Catch Basin - Type 2 6/1/06   B-10.20-00
Typ. Orientation of Type 2 Catch Basin in City Street 7/1/15 609A  
Typical Catch Basin Placement 7/1/15 609B  
Detention System Control Structure 7/1/15 610                              
Solid Metal Cover for Catch Basin  11/21/06   B-30.20-01
Miscellaneous Details for Drainage Structures  9/20/07   B-30.90-01
Manhole Type 3 6/1/06   B-15.60-00
Stormwater Valve  7/1/15 611  
Valve Box Extension 7/1/15 612  
Stormwater Shear Gate 7/1/15  613   
Stormwater Manhole/Catch Basin Adjustment Detail  7/1/15 615  
Detention Vault Access Manhole Lid Over Low Point 7/1/15 616  
Filter Vault Access 7/1/15 617A  
Thru-Curb Inlet Frame Installation 7/1/15 618  
Combination Inlet  6/1/06   B-25.20-00
Rectangular Vaned Grate 6/1/06   B-30.30-00
Rectangular Herringbone Grate 6/1/06   B-30.50-00
Headwall & Rip Rap 7/1/15 620  
Lot Drain Trench 3/1/16 621  
Stenciling Detail 7/1/15 622  
Sidewalk Underdrain System 7/1/15 630  
Catch Basin Frame and Grate Replacement 7/1/15 631  
Rectangular Frame (Reversible) 6/8/06   B-30.10-00
Soil Amendment and Depth 7/1/15 632  
Permeable Pavement Section 7/1/15 643  
Pervious Concrete Sidewalk 7/1/15 646  
Permeable Pavement on Slopes 7/1/15 647  
Roof Rain Harvesting 7/1/15 650  
Bioretention Facility 3/1/16 655  
Bioretention Plant Palette 7/1/15 657  
Bioretention Curb Extension 3/1/16 659  
Bioretention Check Dam 7/1/15 661  
Bioretention In-line Curb Cut 7/1/15 663  
Bioretention Side Curb Cut 3/1/16 665  
Bioretention Outlet Structure 7/1/15 667  
Bioretention Clean-Out 7/1/15 669  
Bioretention Hydrant Access 7/1/15 671  
Perforated Pipe Connection 7/1/15 673  


The links above include PDF pages. You may obtain the free Acrobat Reader to view and print.