Redmond Central Connector

Overview

Location: Downtown and Sammamish Valley

On June 30, 2010, the City of Redmond acquired the Redmond Spur of the Woodinville Subdivision of the Burlington Northern Santa Fe (BNSF) Rail Corridor, which extends approximately 3.9 miles from the junction of SR-520 and Redmond Way in Southeast Redmond to the intersection of Willows Road and NE 124th Street in the Sammamish Valley neighborhood, as shown on the linked map

The Redmond Central Connector Master Plan was adopted in June 2011, which provides near term and long term conceptual plans and goals for the construction of a regional trail, linear park, and cultural corridor that will enhance our City.

The City is currently designing the first phase of the Redmond Central Connector, one mile of trail between the Bear Creek Trail and the Sammamish River Trail.  The trail will be under construction in 2012. 

Station Area Cross Section























Concept of the Redmond Central Connector between 161st Ave NE and Leary Way (at 60 Percent Design)
 
Contact:
Carolyn Hope
425-556-2313