Old Redmond Road from 132 to 140 Avenue NE
Project Cost: $3.9 million
Funding Source: Capital Investment Program
Project Manager: Lisa Singer (lsinger@redmond.gov)
Status: Construction
scheduled to begin in September 2006.
Project Description: Pedestrian,
bicycle, and vehicle safety will be enhanced on this last remaining section of
Old Redmond Road to receive roadway improvements in both Kirkland and Redmond.
Between the Bridle Trails Shopping Center on 132 Avenue NE to the west end of
the Sixty-01 Condominiums at about 136 Avenue NE, Old Redmond Road will be
widened to include one through lane in each direction, a center turn
lane/landscaped median, bike lanes, and sidewalks. Supporting these
improvements will be modifications to storm drainage, landscaping, lighting,
roadway striping, and undergrounding of utilities. To fit the majority of
improvements within the right-of-way, rockeries up to about 5 feet high and
shorter block walls will be required along most of this section.
There are no plans to change the location of the existing curbs or sidewalks
between 136 and 140 Avenue NE. This section of the roadway will be
restriped. Center turn lanes/medians will be added to provide driveway
access and landscaped storm drainage facilities. A pedestrian crossing is
being considered at the existing bus stops located near the west entry to
Sixty-01.
Last updated on November 21, 2006.
|